1. PURPOSE AND SCOPE

This Policy governs the operation of the garment production process under Patternland’s MTM (Made to Measure) model.

It forms an integral part of the General Terms and Conditions of Sale, the Measurement Policy, the Adjustment Policy, and the Dispute Policy.

2. PRODUCTION MODEL

Patternland operates under an on-demand and distributed production model, where each garment is individually produced.

The process is carried out through a network of independent professionals supervised by Patternland.

Patternland acts as the organizer and supervisor of the process.

3. PRODUCTION PROCESS PHASES

The process may include:

  • Measurement validation
  • Design interpretation
  • Pattern making
  • Material preparation
  • Cutting
  • Manufacturing
  • Quality control
  • Shipping preparation

Patternland may introduce intermediate validations.

4. VALIDATIONS AND QUALITY CONTROL

During the process:

  • Pattern review
  • Proportion validation
  • Execution control
  • Final verification

Patternland may correct or redo certain phases if standards are not met.

5. VARIABLE NATURE OF THE PROCESS

The Customer acknowledges that the process is neither industrial nor standardized.

It may lead to:

  • Fabric variations
  • Technical adjustments during execution
  • Differences in finishing

These variations do not constitute defects.

6. MATERIALS AND SUPPLY

Production depends on material availability.

Patternland may:

  • Replace materials with equivalents
  • Adjust timelines
  • Reorganize production

7. PRODUCTION TIMEFRAMES

Timeframes are estimates and may vary due to:

  • Design complexity
  • Workload
  • Availability of professionals
  • Technical incidents
  • Logistical issues

These variations are considered reasonable.

8. TECHNICAL INCIDENTS

During the process, incidents may occur requiring:

  • Design review
  • Pattern adjustments
  • Repetition of certain phases
  • Material replacement

The process will continue according to Patternland’s technical criteria.

9. TECHNICAL IMPOSSIBILITY

In exceptional cases, technical impossibility may be identified.

Patternland may:

  • Propose alternatives
  • Adjust the design
  • Reconfigure the order

10. INVOLVEMENT OF PROFESSIONALS

Different professionals may be involved in the process.

Patternland:

  • Selects the professionals
  • Assigns tasks
  • Supervises execution

11. LIMITATION OF LIABILITY

Patternland shall not be liable for:

  • Process variations
  • Fabric behavior
  • Reasonable delays
  • Incidents related to third parties

12. TRACEABILITY

Patternland may record:

  • Process phases
  • Professional interventions
  • Performed checks

These records may be used as evidence.

13. FINAL DECISION

The management and validation of the production process are exclusively the responsibility of Patternland.

Loading...